Skip to main content
Xentra Medical
HomeHospital Projects

Hospital Projects

Operating Rooms

Plan the operating theatre and its preparation, recovery and clean-support spaces together.

Surgical professionals working together in an operating environment.

Start from the service your team needs to deliver.

An operating room is part of a department. Its usefulness depends on the preparation, clean supply, staff access, patient transfer, recovery and soiled return spaces around it. Our planning connects those relationships with the procedures and workload the hospital intends to support.

We coordinate specialist medical engineering, room finishes, equipment positioning and technical interfaces. Experienced Chinese teams can support key specialist work on site, with ordinary building work and locally qualified activities coordinated through the appropriate local delivery team.

Plan the spaces as one working system.

01

Preparation and transfer

Arrange patient arrival, preoperative preparation, changing, scrub points and transfer routes around the planned clinical pathway.

02

Operating and technical space

Coordinate table position, anaesthesia, surgical lights, pendants, instrument movement, staff work and equipment maintenance.

03

Recovery and clean/soiled support

Connect recovery capacity, sterile stock, preparation, used-item return and the hospital’s wider reprocessing service.

Engineering and room interfaces

  • Cleanroom finishes and ventilation coordination
  • Medical gases, electrical outlets, backup supply and equipment loads
  • Doors, fixed cabinets, ceiling equipment and maintenance access

Equipment around the clinical brief

  • Operating tables, surgical lights and ceiling pendants
  • Anaesthesia, monitoring, suction and emergency equipment
  • Procedure-specific equipment and instrument sets

How the project moves forward

01

Site information

Review the supplied plan, existing services, utilities and project brief.

02

Coordinated design

Resolve specialist engineering and equipment interfaces with the project team.

03

Budget and phases

Align investment priorities, equipment choices and the implementation sequence.

04

Equipment installation

Connect supplier delivery with room readiness and installation responsibilities.

05

Training and continued support

Prepare local teams and plan maintenance, supplies and future development.

Prepare a first discussion

Bring the information you already have.

  • Floor plan and proposed number of operating rooms
  • Specialties, procedures and existing recovery/sterile supply
  • Existing technical drawings, equipment and construction stage

A connected operating-suite plan, an equipment and engineering interface schedule, and a defined sequence for specialist works, installation and handover.

Project questions

Can the project start with one operating room?

Yes. The brief should still address preparation, recovery, clean supply and used-item handling. These functions may be shared with existing hospital services when appropriate.

A clear next step for your hospital.

Tell us what you want to build, improve or source. A short outline is enough to start.